Home / About Us  / Contact Us / SEG Jobs  
  Synchronized Electricity      Solar Electricity      Wind Electricity   Generators | E-Quote        Service | Support

SYNCHRONIZED ELECTRICITY GENERATOR T/R
 SELCO SYNCHRONIZATION CONTROLLER
 
  • Automatic synchronisation
  • Voltage based speed control
  • Frequency and phase lock
  • 50 hour burn-in before test

T5000 Paralleling Relay

The T5000 Paralleling Relay is in fact a check synchroniser.

The T5000 has two separately insulated voltage inputs, one for each system.

A built-in relay will close when voltage, frequency and phase are within safe limits. The relay output can be connected in series with a manual contact to operate the circuit breaker between the two systems.
SelcoDeep SeaCertificates
Engineering Consultancy
> Project Engineering Consultancy
>Tender Engineering Documents
> Power House Engineering
 >Power Plant Engineering
>Electricity Technical Support
>L V Electricity Consultancy
>M V Electricity Consultancy
>H V Electricity Consultancy
>Project Site Assessment
ReadMore